Carry out an initial survey of the totem sign utilising a powered access machine to assess the existing framework and fixings. Advised on additional supports required internally to add strength.
Fabricated 2no back to back panels, powder coated to a standard RAL to replicate the existing signage with applied profile cut vinyl graphics. Overall size based upom 550mm wide x 3000mm high.
Returned to site fit new signage to existing framework and secure into position utilizing a powered access machine. Installed on site during normal working hours, utilising the protective barriers around the working area.
RECENT JOBS
Installation of solar bollards
Following a health and safety review our groundworks team attended an industrial site and installed solar powered bollards.
Gully and drain cleaning
As part of a planned maintenance programme our team visited a commercial building and cleared all act channels and covers, all gutters and other floor drainage.
Refurbishment of flat
Refurbishment of a residential flat above commercial for an investor
Emergency patchwork repairs to roof
Following heavy rains our reactive team attended a commercial building to provide emergency patchwork repairs using liquid resin to a flat roof to prevent short term water ingress.
Line Marking
Our groundworks team attended following a health and safety review and improved the marking for pedestrians in a commercial carpark.
Digital Lock
We attended site following a fire risk assessment and fitted a digital lock to the common parts electrical riser.