Our reactive maintenance team attended a medical centre in order to replace bronze hot water circulator pump and vessel . The team checked hot water outlets around property and at furthest points away from plant room to ensure all getting hot.

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.

2021-01-26T15:35:18+02:00
Go to Top