Our reactive maintenance team attended a medical centre in order to replace bronze hot water circulator pump and vessel . The team checked hot water outlets around property and at furthest points away from plant room to ensure all getting hot.
RECENT JOBS
Installation of Lightweight Steel Frame external walling residential block
Installation of the SFS infill external walls before fitting the fire rated cladding and insulation.
External envelope education extension
Cladding of new build extension . The unusual angles formed by the design were a challenge but the resulting effect was worthwhile.
Feature soffit and canopy commercial building
Installation of a new curved feature soffit and canopy to the entrance of this prestigious City building.
Kerb replacement
Our groundworks team attended an industrial site to dig and replace broken kerbs.
Adapting electric entrance barriers
To install switches into each car park barrier so they can be turned off individually.
Emergency lock replacement
Team attended a commercial building and identified, sourced and replaced lock.