Our groundworks team attended a Midlands industrial estate in order to repair damaged concrete bollards. Broke out and replaced damaged bollard – broke out and replaced concrete around 2nd loose bollard.
RECENT JOBS
Removal of bird waste from flat roof.
Removal of bird waste from flat roof.
Outer Buildings Gutter Clean
Cleaning of gutters to prevent water ingress using spider boom and self propelled boom.
Preparation for New Tennants
Workman attended to ensure that all signage left by previous tenant was removed in preparation for new tenants’ arrival.
Locksmith / Window Locks
A locksmith attended to ensure that window locks operated effectively and hence were effective in securing the building.