Our planned maintenance team team attended an industrial site in order to repair a damaged safety barrier which was a potential health and safety risk. 2 man team to attended site and cut edges of damaged sections to form smooth ends .Supplied and installed 3 new sections of boxed mild steel to replace missing sections.
RECENT JOBS
Groundworks – Health & Safety
Groundworks team attended retail park. Cut out tarmac ready for new tarmac to be laid. Re-laid tarmac to fill potholes.
Groundworks
Groundworks team attended retail park in Peterborough to replace aco drain and channel. Broke out existing drain and channel and supplied and fitted new.
Plumbing – Drainage
Drainage team attended residential property that had severe drain blockages.
Groundworks
Groundwork team attended commercial car park to reset corner stone. Cleaned all old mortar from stone and cleaned base. Reset with new mortar.
Electrical
Electrician attended site and gained access to distribution board and found breaker had tripped. Reset breaker and checked lights.