Our planned maintenance team team attended an industrial site in order to repair a damaged safety barrier which was a potential health and safety risk. 2 man team to attended site and cut edges of damaged sections to form smooth ends .Supplied and installed 3 new sections of boxed mild steel to replace missing sections.
RECENT JOBS
Replacement concrete bollards
Our groundworks team attended a Midlands industrial estate in order to repair damaged concrete bollards.
Fire door replacement
Our reactive maintenance team attended a West End office building in order to replace a fire door.
Block paving repair
Our groundworks team attended an office centre after a number of heavy goods vehicles had damaged the block paving.
Repair of brickwork
Our reactive maintenance team attended a business centre in order to repair a damaged wall.
Replacement glass unit to office conservatory
Our planned maintenance team attended a commercial office in order to replace the damaged glazing on an internal conservatory.
Access door repair
Floor spring and bottom shoe replacement of door