Our planned maintenance team team attended an industrial site in order to repair a damaged safety barrier which was a potential health and safety risk. 2 man team to attended site and cut edges of damaged sections to form smooth ends .Supplied and installed 3 new sections of boxed mild steel to replace missing sections.
RECENT JOBS
Quarterly Refurbishment – Retail Park
Quarterly visit including electrics - signs and trip hazards.
Securing of Site with Concrete Blocks
Unwanted visitors can result in significant damage and legal fees - we are experienced at securing sites using concrete and digging trenches and building up earth mounds.
Repair of ‘Bollard Light’
Having bollards and lights securely fixed prevents vandalism and increased reactive costs.
Tap Replacement
Replacement of tap - we’re happy to help however small the job.
Investigation of water ingress
Often blocked gutters can cause significant problems, these can be avoided by performing regular gutter clearance.
Decoration of Stairwell
Decoration of stairwell.