Our planned maintenance team team attended an industrial site in order to repair a damaged safety barrier which was a potential health and safety risk. 2 man team to attended site and cut edges of damaged sections to form smooth ends .Supplied and installed 3 new sections of boxed mild steel to replace missing sections.
RECENT JOBS
Emergency Repair
Emergency 2 hour repair to damaged height restrictor at Oxford retail park.
Bollard Repair
Repair of damaged raised bollard.
Gutter Clearance
It is obviously important that gutters are kept clear in autumn to prevent water ingress.
Fire Strips
Installation of intumescent strips on fire doors post a Fire Risk assessment.
Refresh of external entrance areas
Pressure washing and sealing of cracks can give external areas an aesthetic uplift.