Our planned maintenance team attended a retail park to replace a damaged ACO channel. Broke out the damaged aco drain channel upon inspection of the 2nd channel and noticed the neighbouring aco was also damaged. So, after gaining authorisation, purchased a replacement . All three new channels were fitted and concreted in place. Finished by filling the gaps both sides with tarmac.
RECENT JOBS
Doors & Access
Attended commercial building to issues regarding front entrance door.
Groundworks
Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.
Commercial Roof Repair
Carried out all repairs required to prevent future leaks.
Fence Repair
Our fencing team attended an industrial centre to repair a fence damaged by reversing lorries.
Line Marking
Line marking team attended site to a London based office block to reline the car park and add additional green parking bays.