Our planned maintenance team attended a retail park to replace a damaged ACO channel. Broke out the damaged aco drain channel upon inspection of the 2nd channel and noticed the neighbouring aco was also damaged. So, after gaining authorisation, purchased a replacement . All three new channels were fitted and concreted in place. Finished by filling the gaps both sides with tarmac.
RECENT JOBS
Installation of Lightweight Steel Frame external walling residential block
Installation of the SFS infill external walls before fitting the fire rated cladding and insulation.
External envelope education extension
Cladding of new build extension . The unusual angles formed by the design were a challenge but the resulting effect was worthwhile.
Feature soffit and canopy commercial building
Installation of a new curved feature soffit and canopy to the entrance of this prestigious City building.
Kerb replacement
Our groundworks team attended an industrial site to dig and replace broken kerbs.
Adapting electric entrance barriers
To install switches into each car park barrier so they can be turned off individually.