Our planned maintenance team attended a retail park to replace a damaged ACO channel. Broke out the damaged aco drain channel upon inspection of the 2nd channel and noticed the neighbouring aco was also damaged. So, after gaining authorisation, purchased a replacement . All three new channels were fitted and concreted in place. Finished by filling the gaps both sides with tarmac.
RECENT JOBS
Plumbing – Drainage
Drainage team attended residential property that had severe drain blockages.
Groundworks
Groundwork team attended commercial car park to reset corner stone. Cleaned all old mortar from stone and cleaned base. Reset with new mortar.
Electrical
Electrician attended site and gained access to distribution board and found breaker had tripped. Reset breaker and checked lights.
Installation of Lightweight Steel Frame external walling residential block
Installation of the SFS infill external walls before fitting the fire rated cladding and insulation.
External envelope education extension
Cladding of new build extension . The unusual angles formed by the design were a challenge but the resulting effect was worthwhile.