Our planned maintenance team attended a retail park to replace a damaged ACO channel. Broke out the damaged aco drain channel upon inspection of the 2nd channel and noticed the neighbouring aco was also damaged. So, after gaining authorisation, purchased a replacement . All three new channels were fitted and concreted in place. Finished by filling the gaps both sides with tarmac.
RECENT JOBS
Earth Works
Is your site secure from unwanted visitors? The construction of a trench to prevent unauthorised caravans/vehicles from entering.
Ensuring Christmas Happens
Visited site to ensure that all Christmas light sockets were operational!
Installation of Gate
Fabrication and installation of new double leaf gate.
Pre-Christmas Refresh
Painting of bike racks and handrails ready for Christmas shopping at retail centre
Sign Clean
Cleaning of sign at entrance to industrial park.
Winter Preparations
In preparation for winter - drains cleared and over hanging trees branches cut back to prevent leaves falling into drains.