Our planned maintenance team attended a retail park to replace a damaged ACO channel. Broke out the damaged aco drain channel upon inspection of the 2nd channel and noticed the neighbouring aco was also damaged. So, after gaining authorisation, purchased a replacement . All three new channels were fitted and concreted in place. Finished by filling the gaps both sides with tarmac.
RECENT JOBS
Removal of electric entrance barrier
Our reactive team were called to a retail park in order to remove an electric entrance barrier.
Main access door repair
Our team attended as a matter of urgency a commercial building where the main access doors had developed a problem.
Decorating
After a number of leaks our decorating team attended a commercial building to redecorate the staircases and landings. Initially stain block was applied followed by two coats of matt emulsion.
Floor replacement
Our flooring team attended a hospital and replaced corridor flooring. This was done over two weekends so as not to disrupt patients.
Glazing repair
Attended a commercial unit and reglazed a shaped toughened tinted glass double glazed sealed unit with manifestation to match existing
Construction of smoking shelter and associated groundworks
Supplied, delivered and assembled an open fronted smoking shelter