Our planned maintenance team attended a retail park to replace a damaged ACO channel. Broke out the damaged aco drain channel upon inspection of the 2nd channel and noticed the neighbouring aco was also damaged. So, after gaining authorisation, purchased a replacement . All three new channels were fitted and concreted in place. Finished by filling the gaps both sides with tarmac.
RECENT JOBS
Perimeter Fence
Installation of perimeter fencing
Installation of Bollards
Installation of Bollards.
Lighting Ornamental Stone
Lighting the ornamental stone bearing a shopping centre name.
External Steps
Repair of step to remove trip hazard.
Steel Edge Protection
Installation of plant, edge and isolation switch protection and gates.