Our working at heights planned maintenance team cut out glazing from 3rd floor ensuring that broken glass did not fall below and replaced using a scissor hoist, GGR mini crawler crane and MR4 glass vacuum suckers.
RECENT JOBS
Electrical
Electrician attended commercial building to find no power supply to led light fixture.
Line Marking
Team attended retail park and carried out line marking to the entrance of the car park.
Doors & Access
Attended commercial building to issues regarding front entrance door.
Groundworks
Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.
Commercial Roof Repair
Carried out all repairs required to prevent future leaks.