Our planned maintenance team sent a 2 man team to an industrial park to break out damaged 3 kerb stones and 2 paving slabs that were a potential health and safety hazard and then supply and install 3 new kerb stones and 2x 600×900 paving slabs
RECENT JOBS
Gate repairs
Our reactive maintenance team attended an industrial unit due to a damaged gate.
Gutter and roof clearance
Our preventative maintenance team attended an industrial site in order to clear out roof gutters and flush downpipes in order to prevent any future water ingress
Decorating
Our decorating team attended a retail outlet in order to repair an area of water ingress.
Refurbishment following water ingress
Our decorating team attended a student accommodation block following a water leak
Gutter and downpipes clearance
Our guttering team attended a retail centre and insured that all downpipes were cleared and flushed