Our planned maintenance team sent a 2 man team to an industrial park to break out damaged 3 kerb stones and 2 paving slabs that were a potential health and safety hazard and then supply and install 3 new kerb stones and 2x 600×900 paving slabs
RECENT JOBS
Sealing of flat roof above lift shaft
Our planned maintenance team attended a commercial building in order to service and seal a flat roof above a 10 story lift shaft to ensure that there would be no water ingress in to the lift shaft and thus preventing any future issues with the lift and its mechanical parts
Installation of access hatches
Our planned maintenance team attended a site in Canary Wharf and installed 4 * access hatched into the rear of kitchen cupboards to facilitate easy access to utilities
New post and sign
Our planned maintenance team attended an industrial site and installed a new standing post and 15mph speed sign as a health and safety measure.
Replacement of damaged safety barrier
Our planned maintenance team team attended an industrial site in order to repair a damaged safety barrier which was a potential health and safety risk.
Freddy the falcon
Seagulls were creating a health and safety issue at an industrial site.
Lobby decoration
Our decorating team attended a commercial premises in order to decorate the citing and stairwells of the large lobby area.