Our planned maintenance team sent a 2 man team to an industrial park to break out damaged 3 kerb stones and 2 paving slabs that were a potential health and safety hazard and then supply and install 3 new kerb stones and 2x 600×900 paving slabs
RECENT JOBS
Refurbishment of disabled toilet.
Refurbishment of disabled toilet.
Emergency Repair of Bollard
Emergency repair of bollard hit by a vehicle.
Tiling of Bathroom
Tiling of Bathroom
Rubbish Removal
Safe removal of rubbish.
Installation of Microwave Sensors
Installation of microwave sensors on stairs.
Hazard Strips
Installation of hazard strips to ensure that health and safety issues don’t occur in plant room.








