Our planned maintenance team sent a 2 man team to an industrial park to break out damaged 3 kerb stones and 2 paving slabs that were a potential health and safety hazard and then supply and install 3 new kerb stones and 2x 600×900 paving slabs
RECENT JOBS
Removal of bird waste from flat roof.
Removal of bird waste from flat roof.
Outer Buildings Gutter Clean
Cleaning of gutters to prevent water ingress using spider boom and self propelled boom.
Preparation for New Tennants
Workman attended to ensure that all signage left by previous tenant was removed in preparation for new tenants’ arrival.
Locksmith / Window Locks
A locksmith attended to ensure that window locks operated effectively and hence were effective in securing the building.