Our reactive maintenance team attended a retail’s centre where a carpet had come loose and was presenting a potential heath and safety hazard. Carpet was refitted and tested.

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.

2020-03-11T20:28:30+02:00
Go to Top