There were reports of water ingress effecting an industrial premises so our gutters team were sent to investigate. The building had gutter guards so not much debris in them. Where there was debris removed gutter guard and cleaned. Managed to access area on roof where slates had slipped and could be the cause of ingress. Unable to reach 1 tile with MEWP.
Gained access to building roof
Sealed some splits on valley, this looks like it may have been repaired previously.
RECENT JOBS
Paving replacement
Our groundworks team attended an office building in response to a health and safety audit.
Installation of barrier and hoop barriers
Our groundworks team attended an industrial site in order to install and test road barrier
Bike shelter construction
Our groundworks team attended a commercial site to install 6m cantilever cycle shelter.
Refurbishment of external areas
Our planned maintenance team attended a commercial property to refurbish some of the outside areas.
Plumbing Installation
Our plumbing team attended a commercial building in order to adapt existing pipework, install a cold water feed tape and adapt the waste removal pipe in order to allow the installation of a a dishwasher.
Roof Edge Protection
Our preventive maintenance team attended a commercial building as a health and safety report had indicated that the roof edging should be increased in height. Using safety harnesses the team dismantled the existing structure and resembled to meet the height requirement.