There were reports of water ingress effecting an industrial premises so our gutters team were sent to investigate. The building had gutter guards so not much debris in them. Where there was debris removed gutter guard and cleaned. Managed to access area on roof where slates had slipped and could be the cause of ingress. Unable to reach 1 tile with MEWP.
Gained access to building roof
Sealed some splits on valley, this looks like it may have been repaired previously.
RECENT JOBS
New street lights
Electrical installation team fitted 3 new 6 meter street lights in commercial office car park with LEDs. This included groundwork in order to install new electrical cabling for the lights.
Installation palisade fence
Planned maintenance team installed a fabricated palisade fence at an industrial site in order to enhance the security of the site.
Installation Aco drain
Groundworks team installed removed existing damaged drainage channel and installed new ACO drain.
Refurbishment of Fire Escape
As part of a planned maintenance schedule in response to a Fire Risk Assessment we cleaned , applied non slip finish , highlighted nosings, painted fire door and applied D-handle to fire escape and fire exit.
Door Frame Repair
Our carpentry team responded to a reactive maintenance request to repair the door frame of the ladies toilets in an office building.
Fitting of Hand Dryer
Fitting of a new hand dryer in ladies tiles of office as part of a refurbishment.