There were reports of water ingress effecting an industrial premises so our gutters team were sent to investigate. The building had gutter guards so not much debris in them. Where there was debris removed gutter guard and cleaned. Managed to access area on roof where slates had slipped and could be the cause of ingress. Unable to reach 1 tile with MEWP.
Gained access to building roof
Sealed some splits on valley, this looks like it may have been repaired previously.
RECENT JOBS
Glazing repair
Attended a commercial unit and reglazed a shaped toughened tinted glass double glazed sealed unit with manifestation to match existing
Construction of smoking shelter and associated groundworks
Supplied, delivered and assembled an open fronted smoking shelter
Refurbishment / decoration of waste bin area
Our team attended a commercial office building for refurb and decorating
Electrical works
Our electricians attended a commercial office building due to a flatly floor socket. Tested socket - made safe. Returned to site and replaced damaged socket
Line Marking
Additional numbered parking was required at a retail site.
Repair of Totem sign at retail park
Carry out an initial survey of the totem sign utilising a powered access machine to assess the existing framework and fixings. Advised on additional supports required internally to add strength.