There were reports of water ingress effecting an industrial premises so our gutters team were sent to investigate. The building had gutter guards so not much debris in them. Where there was debris removed gutter guard and cleaned. Managed to access area on roof where slates had slipped and could be the cause of ingress. Unable to reach 1 tile with MEWP.
Gained access to building roof
Sealed some splits on valley, this looks like it may have been repaired previously.
RECENT JOBS
Preparation for New Tennants
Workman attended to ensure that all signage left by previous tenant was removed in preparation for new tenants’ arrival.
Locksmith / Window Locks
A locksmith attended to ensure that window locks operated effectively and hence were effective in securing the building.
Installation of Fire Doors
Installation of fire doors - SPA have a number of years experience of responding to Fire risk assessments and Health and Safety surveys.
Maintenance of Delivery Access
Servicing and maintenance of ground floor delivery doors including door adjustment , sealing strip to prevent heat loss and re positioning of gears.