Due to water ingress we carried out a detailed inspection of all membranes and fittings and gave a full report to the client along with potential works to rectify the problem. We also identified and specified the areas that should still be covered under warranty from the original roofing company that repacked the roof allowing the client to potentially make a specific and detailed claim. See associated pictures.
RECENT JOBS
Decorating
Our decorating team redecorated an internal lobby that had been badly affected by water ingress.
Fire door adjustment
Building fabric team attended a commercial premises in order to attend to a fire door that was unable to close property.
Groundworks
The groundworks team attended a business park in order to re-lift uneven slabs, throw away broken ones as required and relay slabs
Decoration
Our refurbishment team attended an office building in order to refurbish a board room.
It’s getting to feel a lot like Christmas…
Our electrical team attended a retail park and installed commando sockets in the lampposts along the entry drive way in anticipation of the installation of Christmas lights