Due to water ingress we carried out a detailed inspection of all membranes and fittings and gave a full report to the client along with potential works to rectify the problem. We also identified and specified the areas that should still be covered under warranty from the original roofing company that repacked the roof allowing the client to potentially make a specific and detailed claim. See associated pictures.
RECENT JOBS
Installation of New Glass Canopy
Installation of new glass canopy over commercial building entrance.
Glass Pane
Emergency replacement of cracked pane of glass at commercial building.
Speed Limit Sign
Installation of speed limit sign to ensure safe traffic flows at industrial site.
Concrete Trip Hazards
Concreting of trip hazards - The swift identification and rectifying of any trip hazards can prevent any injury or claims occurring
Highlighting of Steps
Highlighting of steps in order to prevent trip hazards and potential accidents.