Due to water ingress we carried out a detailed inspection of all membranes and fittings and gave a full report to the client along with potential works to rectify the problem. We also identified and specified the areas that should still be covered under warranty from the original roofing company that repacked the roof allowing the client to potentially make a specific and detailed claim. See associated pictures.
RECENT JOBS
Speed Limit Sign
Installation of speed limit sign to ensure safe traffic flows at industrial site.
Concrete Trip Hazards
Concreting of trip hazards - The swift identification and rectifying of any trip hazards can prevent any injury or claims occurring
Highlighting of Steps
Highlighting of steps in order to prevent trip hazards and potential accidents.
Securing of Bike Shed
Fitting slats to open section of a bike store and new lock : Preventative measures to prevent fly tipping and secure open areas can save clearance costs.
Speed Ramps
Installation of speed ramps - It is important to ensure that traffic in private roads is managed effectively to prevent accidents.










