Our reactive team attended a leisure complex in order to :
– Remove broken/damaged speed bumps in 2 areas of the service yard
– Supply and install 2 new speed ramps – 3.5m and 5.5m
These were heavy Duty Speed Bumps equipped with an internal steel plate, which makes them more durable and able to withstand heavier loads.
RECENT JOBS
Groundworks
Attended retail car park and removed damaged bollards. Supplied and fitted new concrete bollards.
Decorating
Attended commercial office and prepared areas for decorating.
Flat Roof Works
Attended commercial building and carried out roof repairs. Added extra pipework to divert water, repaired flashing and coated entire flat roof with liquid rubber.
External Decorating
Attended office car park and repainted the middle island of the car park entrance.
Electrical
Electrician attended commercial building to find no power supply to led light fixture.