Our reactive team attended a leisure complex in order to :
– Remove broken/damaged speed bumps in 2 areas of the service yard
– Supply and install 2 new speed ramps – 3.5m and 5.5m
These were heavy Duty Speed Bumps equipped with an internal steel plate, which makes them more durable and able to withstand heavier loads.
RECENT JOBS
Installation of bike racks
Our planned maintenance team attended a business park in order to install bike racks to encourage cycling to the workplace.
Pavement repair
Our groundworks team attended a retail park to repair a pavement.
Repair of gas leak
Our reactive gas team attended a commercial building in order to attend a reported gas leak.
Repair of barrier and fence
Repair of barrier and fence in service yard
Replace water pump
Our reactive maintenance team attended a medical centre in order to replace bronze hot water circulator pump and vessel .
Flying response
Our flying response team attended a site in order to provide various accommodation options for birds and bugs who may be visiting.