Our reactive team attended a leisure complex in order to :
– Remove broken/damaged speed bumps in 2 areas of the service yard
– Supply and install 2 new speed ramps – 3.5m and 5.5m
These were heavy Duty Speed Bumps equipped with an internal steel plate, which makes them more durable and able to withstand heavier loads.
RECENT JOBS
Plumbing – Drainage
Drainage team attended residential property that had severe drain blockages.
Groundworks
Groundwork team attended commercial car park to reset corner stone. Cleaned all old mortar from stone and cleaned base. Reset with new mortar.
Electrical
Electrician attended site and gained access to distribution board and found breaker had tripped. Reset breaker and checked lights.
Installation of Lightweight Steel Frame external walling residential block
Installation of the SFS infill external walls before fitting the fire rated cladding and insulation.
External envelope education extension
Cladding of new build extension . The unusual angles formed by the design were a challenge but the resulting effect was worthwhile.