Our reactive team attended a leisure complex in order to :

– Remove broken/damaged speed bumps in 2 areas of the service yard
– Supply and install 2 new speed ramps – 3.5m and 5.5m

These were heavy Duty Speed Bumps equipped with an internal steel plate, which makes them more durable and able to withstand heavier loads.

RECENT JOBS

CCTV

Installation of a lamp post and cctv camera at a site that was susceptible to fly tipping

2020-12-15T15:04:45+02:00
Go to Top