Our reactive team attended a leisure complex in order to :
– Remove broken/damaged speed bumps in 2 areas of the service yard
– Supply and install 2 new speed ramps – 3.5m and 5.5m
These were heavy Duty Speed Bumps equipped with an internal steel plate, which makes them more durable and able to withstand heavier loads.
RECENT JOBS
Brickwork Repair
Following the identification of a pillar in disrepair our reactive maintenance team attended site. They toothed out all broken brick work in the pillar and re-layed new bricks to rebuild the pillar.
Ground works post H&S review
Our groundwork team attended to repair broken paving slabs. This was following a heath and safety review which had identified them as slip hazards.
FRA Response
Our maintenance team attended a central London office to deal with recommendations post a Fire Risk Assessment. One of which was to relocate the fire extinguishers.
Groundworks
Our groundworks team reset and concreted in two bollards at an industrial site where HGVs had been colliding with the bollards previously.
Electrical Works
Our electrical installation team were asked to attend a business park to check the installation of a number of internal and external LED lights.
Roof Repairs
We attended a site at a commercial business park to carry out a brief roof inspection and then remedial works as considered necessary due to water ingress.