Our reactive team attended a leisure complex in order to :
– Remove broken/damaged speed bumps in 2 areas of the service yard
– Supply and install 2 new speed ramps – 3.5m and 5.5m
These were heavy Duty Speed Bumps equipped with an internal steel plate, which makes them more durable and able to withstand heavier loads.
RECENT JOBS
Roof Repairs
Reactive maintenance commercial roof repair involving the sealing of up stands and joints in roof felting due to a roof leak.
Resetting of granite setts
Resetting of granite setts and road resurfacing on roadway at office building complex as part of planned preventive maintenance.
Installation of steel bollards
Installation of steel bollards to separate pedestrians at retail centre.
Installation of fabricated gate and fence
Fabrication of gates and fencing at industrial complex to enhance security as part of planned preventive maintenance programme.
Installation of LED floodlights
Electrical Installation of 6 LED floodlights at office complex as part of planned preventative maintenance programme.
Servicing and repair of entrance doors
Reactive servicing and repair of entrance doors to office to ensure security maintained.