Our reactive team attended a leisure complex in order to :
– Remove broken/damaged speed bumps in 2 areas of the service yard
– Supply and install 2 new speed ramps – 3.5m and 5.5m
These were heavy Duty Speed Bumps equipped with an internal steel plate, which makes them more durable and able to withstand heavier loads.
RECENT JOBS
Installation of floodlights and electrical testing
Installation of floodlights and electrical testing.
Replacement of Loose Slabs
Groundwork replacement of loose slabs at commercial office to prevent health and safety risk.
Filling of Pothole
Filling of pothole with cold tarmac to prevent trip hazard and standing water build up.
Installation of motion sensor and external light
Installation of external light and motion sensor for commercial building.
Refurbishment of disabled toilet.
Refurbishment of disabled toilet.
Emergency Repair of Bollard
Emergency repair of bollard hit by a vehicle.