Our reactive team attended a leisure complex in order to :
– Remove broken/damaged speed bumps in 2 areas of the service yard
– Supply and install 2 new speed ramps – 3.5m and 5.5m
These were heavy Duty Speed Bumps equipped with an internal steel plate, which makes them more durable and able to withstand heavier loads.
RECENT JOBS
Hazard Strips
Installation of hazard strips to ensure that health and safety issues don’t occur in plant room.
Health and Safety Inspections
It is important that all ladders are inspected on a regular basis.
Gate Reinstatement
Reinstatement of gate at industrial park.
Fire Doors
Installation and upgrade of fire doors.
Carpet Cleaning
Deep cleaning a carpet is often as effective as a replacement.
Repair of Pathways and Roads
Repair of pathways and roads at medical centre.