Our reactive maintenance team attended a retail site in order to repair a sticking door that had swollen due to the bad weather. Threshold was planed down to ensure that the door was able to open and shut smoothy.

RECENT JOBS

Decorating

After a number of leaks our decorating team attended a commercial building to redecorate the staircases and landings. Initially stain block was applied followed by two coats of matt emulsion.

2022-02-14T19:00:15+02:00
Go to Top