Line Marking
spaltd2024-05-02T12:40:29+02:00Line marking team attended office car park. Supplied and applied thermoplastic on tarmac.
Installation of Lightweight Steel Frame external walling residential block
spaltd2023-11-02T10:14:15+02:00Installation of the SFS infill external walls before fitting the fire rated cladding and insulation.
External envelope education extension
spaltd2023-11-02T10:11:29+02:00Cladding of new build extension . The unusual angles formed by the design were a challenge but the resulting effect was worthwhile.
Feature soffit and canopy commercial building
spaltd2023-11-02T10:10:32+02:00Installation of a new curved feature soffit and canopy to the entrance of this prestigious City building.
Removal of electric entrance barrier
spaltd2023-04-03T13:33:58+02:00Our reactive team were called to a retail park in order to remove an electric entrance barrier.
Decorating
spaltd2023-04-03T13:28:13+02:00After a number of leaks our decorating team attended a commercial building to redecorate the staircases and landings. Initially stain block was applied followed by two coats of matt emulsion.
Floor replacement
spaltd2023-04-03T13:23:22+02:00Our flooring team attended a hospital and replaced corridor flooring. This was done over two weekends so as not to disrupt patients.
Construction of smoking shelter and associated groundworks
spaltd2023-01-11T18:11:22+02:00Supplied, delivered and assembled an open fronted smoking shelter
Refurbishment / decoration of waste bin area
spaltd2023-01-11T18:05:35+02:00Our team attended a commercial office building for refurb and decorating