Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage. They:
- Supplied and installed replacement doors to the:
– 5th,4th,3rd and 2nd female
– 4th , 3rd and 2nd male - replaced Vanity Panel @ 462mm x 462mm on 18mm MR MDF core faced front & rear in Alpi wood veneer laminate 10.97 both sides. Hardwood Oak lipped.
- Concealed all edges with a stain finish as close as possible to laminate colour. Each panel drilled for 3 hinges.
- Supplied and fit new hinges to each door.
RECENT JOBS
Gutter and roof clearance
Our preventative maintenance team attended an industrial site in order to clear out roof gutters and flush downpipes in order to prevent any future water ingress
Decorating
Our decorating team attended a retail outlet in order to repair an area of water ingress.
Refurbishment following water ingress
Our decorating team attended a student accommodation block following a water leak
Gutter and downpipes clearance
Our guttering team attended a retail centre and insured that all downpipes were cleared and flushed
Totem Refurbishment
Our maintenance team attend a retail site - removed old vinyls and replaced with new tenant vinyls on 3 totems - cleaned and removed graffiti
Security Signage
Our maintenance team attended a business park and installed security signage (CCTV in operation and private property) in order to ensure that 3rd parties were made aware upon visiting