Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage. They:
- Supplied and installed replacement doors to the:
– 5th,4th,3rd and 2nd female
– 4th , 3rd and 2nd male - replaced Vanity Panel @ 462mm x 462mm on 18mm MR MDF core faced front & rear in Alpi wood veneer laminate 10.97 both sides. Hardwood Oak lipped.
- Concealed all edges with a stain finish as close as possible to laminate colour. Each panel drilled for 3 hinges.
- Supplied and fit new hinges to each door.
RECENT JOBS
Lobby decoration
Our decorating team attended a commercial premises in order to decorate the citing and stairwells of the large lobby area.
Light repair in car park
Our electrical team attended site and isolated electrical supply to light fittings.
EICR wiring certificate
Our electrical team attended site in order to test and provide an EICR on 3 36 way 3 phase distribution boards.
Palisade fence repairs at industrial site
Our reactive maintenance team for repair works carried out to palisade gates to the front of unit of 4 adjusting gates to allow locking eyes to line up.
Decoration of residential flat
Our decorating team attended site in order to redecorate all walls of a residential flat following a change of tenancy.
‘One stop shop’ – Health and safety – roofing – electrics – decorating
Our multi skilled team attended a commercial premises in order to fulfil a number of ‘handyman’ jobs in one visit highlighted in a health and safety assessment and tenant.