Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage. They:
- Supplied and installed replacement doors to the:
– 5th,4th,3rd and 2nd female
– 4th , 3rd and 2nd male - replaced Vanity Panel @ 462mm x 462mm on 18mm MR MDF core faced front & rear in Alpi wood veneer laminate 10.97 both sides. Hardwood Oak lipped.
- Concealed all edges with a stain finish as close as possible to laminate colour. Each panel drilled for 3 hinges.
- Supplied and fit new hinges to each door.
RECENT JOBS
Bracket replacement for screens shielding car park
Our planned maintenance team attended a car park at a commercial centre in order to replace the brackets holding in place the shielding screens for the multi storey car park.
Lock replacements
Our locksmith attended a commercial office in order to replace locks in the building
Line marking retail park
Our planned maintenance team attended a retail park out of hours and completed an extensive line marking exercise
Installation of barbed wire
Our reactive maintenance team removed damaged barbed wire and broken brackets from a barbed wire fence in order to mitigate a security risk.
Emergency boarding up
Our reactive team attended an industrial park in order to board up broken windows of an empty unit which represented a security risk
Installation of fire exit signs
Our planned maintenance team attended a car park in order to install fire safety signs in response to a fire risk assessment.