Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage. They:
- Supplied and installed replacement doors to the:
– 5th,4th,3rd and 2nd female
– 4th , 3rd and 2nd male - replaced Vanity Panel @ 462mm x 462mm on 18mm MR MDF core faced front & rear in Alpi wood veneer laminate 10.97 both sides. Hardwood Oak lipped.
- Concealed all edges with a stain finish as close as possible to laminate colour. Each panel drilled for 3 hinges.
- Supplied and fit new hinges to each door.
RECENT JOBS
Re-lay of slabs
Two man groundworks team attended a central London commercial location.
Replacement of manhole cover
Our groundworks team attended an industrial estate in order to replace a gas cover.
Decorating of investment property
An investment property as part of a client portfolio was attended by our planned maintenance team.
Repair of fire escape gate
Our reactive maintenance team attended an industrial park in order to repair a gate that was unable to open - the gate also acts as a fire escape route
Larger bird boxes!
We returned to a commercial site where previously bird boxes had been installed in order to install some roomier boxes to cater for the larger bird!
Installation of Palisade fencing
Our planned maintenance team installed a palisade fence in order to prevent fly tipping at an industrial site.