Vanity unit refurbishment

Vanity unit refurbishment

Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage. They:

  • Supplied and installed replacement doors to the:
    – 5th,4th,3rd and 2nd female
    – 4th , 3rd and 2nd male
  • replaced Vanity Panel @ 462mm x 462mm on 18mm MR MDF core faced front & rear in Alpi wood veneer laminate 10.97 both sides. Hardwood Oak lipped.
  • Concealed all edges with a stain finish as close as possible to laminate colour. Each panel drilled for 3 hinges.
  • Supplied and fit new hinges to each door.

RECENT JOBS

Groundworks

Groundworks team attended retail park in Peterborough to replace aco drain and channel. Broke out existing drain and channel and supplied and fitted new.

Groundworks

Groundwork team attended commercial car park to reset corner stone. Cleaned all old mortar from stone and cleaned base. Reset with new mortar.

Electrical

Electrician attended site and gained access to distribution board and found breaker had tripped. Reset breaker and checked lights.

Glazing

Supplied and fitted toughened and laminated safety glass double glazed unit to office window.

2021-06-17T11:04:17+02:00
Go to Top