Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage. They:
- Supplied and installed replacement doors to the:
– 5th,4th,3rd and 2nd female
– 4th , 3rd and 2nd male - replaced Vanity Panel @ 462mm x 462mm on 18mm MR MDF core faced front & rear in Alpi wood veneer laminate 10.97 both sides. Hardwood Oak lipped.
- Concealed all edges with a stain finish as close as possible to laminate colour. Each panel drilled for 3 hinges.
- Supplied and fit new hinges to each door.
RECENT JOBS
Corona signage
Our preventive maintenance team attended a commercial premises in order to install signage to ensure that the site complied with health and safety guidance to prevent the corona.
Fire extinguisher installations
In response to a Fire risk Assessment our reactive maintenance team attended an industrial complex. They installed fire extinguishers and suitable signage through out the unit.
Hand sanitiser station
Or reactive team visited a commercial office in order to supply and instal a hand sanitiser station to ensure that the site complied with the Health and Safety guidance to combat the corona.
Signage to ensure building corona ready
Our reactive team attend a client site and fixed signage throughout the building to ensure compliance with all health and safety requirements prior to the premises being reoccupied post corona.
Corona Ready Office
Our reactive team visited a commercial office to install star signage, lift signage, screens and sanitiser stations.
Refurbishment of retail premises
Our refurbishment team attended a retail premises that was closed due to the corona.