Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage. They:
- Supplied and installed replacement doors to the:
– 5th,4th,3rd and 2nd female
– 4th , 3rd and 2nd male - replaced Vanity Panel @ 462mm x 462mm on 18mm MR MDF core faced front & rear in Alpi wood veneer laminate 10.97 both sides. Hardwood Oak lipped.
- Concealed all edges with a stain finish as close as possible to laminate colour. Each panel drilled for 3 hinges.
- Supplied and fit new hinges to each door.
RECENT JOBS
Office door repair
Our maintenance team were asked to urgently attend a commercial building where the lock had been tampered with, creating a security issue.
Rubbish Clearance
Our reactive maintenance team were happy to attend a retail park to clear rubbish.
Preventing water ingress
Our commercial roofing team attended a Greater London commercial building to prevent water ingress
Fire Stopping
Our planned maintenance team attended a commercial site where a fire risk assessment had identified some weakness in the fire stopping of the basement electrical cupboard.
Paving Replacement
Our groundworks team attended a retail centre due to a potential health and safety hazard.
Entrance door repairs
Our planned maintenance team attended a commercial building in Canary Wharf in order to service double glass doors which had not been operating correctly.