Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage. They:
- Supplied and installed replacement doors to the:
– 5th,4th,3rd and 2nd female
– 4th , 3rd and 2nd male - replaced Vanity Panel @ 462mm x 462mm on 18mm MR MDF core faced front & rear in Alpi wood veneer laminate 10.97 both sides. Hardwood Oak lipped.
- Concealed all edges with a stain finish as close as possible to laminate colour. Each panel drilled for 3 hinges.
- Supplied and fit new hinges to each door.
RECENT JOBS
Carpark repair
Our groundworks team attended a commercial building carpark to supply and fit water gullies.
Acyrpol roof repair
We attended a commercial building where client had reported splits appearing in the roof covering and intermittent problems with water ingress.
Fence repair
Our reactive maintenance team attended an office premises where a fence panel had been damaged in high winds.
Refurbishment of stairs and flooring
Our planned maintenance team attended a commercial office out of hours in order to relay a new carpet on the stairs and new flooring in entrance hall and bathrooms.
ACO channel replacement
Our groundworks team attended an industrial site in order to replace a heavy duty ACO S channel.
Retail carpet repair
Our reactive maintenance team attended a retail’s centre where a carpet had come loose and was presenting a potential heath and safety hazard