Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage. They:
- Supplied and installed replacement doors to the:
– 5th,4th,3rd and 2nd female
– 4th , 3rd and 2nd male - replaced Vanity Panel @ 462mm x 462mm on 18mm MR MDF core faced front & rear in Alpi wood veneer laminate 10.97 both sides. Hardwood Oak lipped.
- Concealed all edges with a stain finish as close as possible to laminate colour. Each panel drilled for 3 hinges.
- Supplied and fit new hinges to each door.
RECENT JOBS
Floor replacement
Floor replacement as part of a refurbishment programme.
Gutter clearance
Our planned maintenance team carried out the quarterly gutter clearance at a commercial premises.
Paving replacement
Our groundworks team attended an office building in response to a health and safety audit.
Installation of barrier and hoop barriers
Our groundworks team attended an industrial site in order to install and test road barrier
Bike shelter construction
Our groundworks team attended a commercial site to install 6m cantilever cycle shelter.
Refurbishment of external areas
Our planned maintenance team attended a commercial property to refurbish some of the outside areas.