Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage. They:
- Supplied and installed replacement doors to the:
– 5th,4th,3rd and 2nd female
– 4th , 3rd and 2nd male - replaced Vanity Panel @ 462mm x 462mm on 18mm MR MDF core faced front & rear in Alpi wood veneer laminate 10.97 both sides. Hardwood Oak lipped.
- Concealed all edges with a stain finish as close as possible to laminate colour. Each panel drilled for 3 hinges.
- Supplied and fit new hinges to each door.
RECENT JOBS
Gully and drain cleaning
As part of a planned maintenance programme our team visited a commercial building and cleared all act channels and covers, all gutters and other floor drainage.
Refurbishment of flat
Refurbishment of a residential flat above commercial for an investor
Emergency patchwork repairs to roof
Following heavy rains our reactive team attended a commercial building to provide emergency patchwork repairs using liquid resin to a flat roof to prevent short term water ingress.
Line Marking
Our groundworks team attended following a health and safety review and improved the marking for pedestrians in a commercial carpark.
Digital Lock
We attended site following a fire risk assessment and fitted a digital lock to the common parts electrical riser.