Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage. They:
- Supplied and installed replacement doors to the:
– 5th,4th,3rd and 2nd female
– 4th , 3rd and 2nd male - replaced Vanity Panel @ 462mm x 462mm on 18mm MR MDF core faced front & rear in Alpi wood veneer laminate 10.97 both sides. Hardwood Oak lipped.
- Concealed all edges with a stain finish as close as possible to laminate colour. Each panel drilled for 3 hinges.
- Supplied and fit new hinges to each door.
RECENT JOBS
Collapsed Manhole Cover
Our groundworks team attended an industrial park in order to repair frame and cover of collapsed manhole highlighted by a health and safety review. .
Wall construction and handrail replacement
Our groundworks team visited an industrial park in order to reconstruct a damaged wall and replace and reattach a handrail.
Health and Safety Job
Following a health and safety survey our preventative maintenance team were asked to highlight potential hazards at a commercial building to reduce the risk of accidents.
Decoration
Out of hours planned maintenance of stud wall construction and paining to improve the layout of office in a commercial building.
Wall Construction
Reactive maintenance - our groundworks team attended a business park to reconstruct a wall that had been damaged by a vehicle, reusing existing brickworks where possible.