Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage. They:
- Supplied and installed replacement doors to the:
– 5th,4th,3rd and 2nd female
– 4th , 3rd and 2nd male - replaced Vanity Panel @ 462mm x 462mm on 18mm MR MDF core faced front & rear in Alpi wood veneer laminate 10.97 both sides. Hardwood Oak lipped.
- Concealed all edges with a stain finish as close as possible to laminate colour. Each panel drilled for 3 hinges.
- Supplied and fit new hinges to each door.
RECENT JOBS
Christmas tree installation
Our reactive Elves team purchased a number of Christmas trees and decorations for a large commercial building in Cambridge. Trees were then installed and decorated.
Temporary roof repairs
Our roofing team carried out temporary commercial roof repairs to a commercial building prior to more substantive replacement in the next financial year. EPDM and liquid resin were applied.
Decorating and refurbishment
Our decorating team attended and repainted a complete flat for an investment landlord prior to new tenants moving in.
Lock replacement
Our locksmith attended a commercial building in order to replace a lock so that there was a thumb turn on the inside to allow people to exit the building without a key.
Relay paving stones
The groundworks team attended a retail park where damaged paving stones represented a trip hazard and relaid.
Collapsed Manhole Cover
Our groundworks team attended an industrial park in order to repair frame and cover of collapsed manhole highlighted by a health and safety review. .







