Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage. They:
- Supplied and installed replacement doors to the:
– 5th,4th,3rd and 2nd female
– 4th , 3rd and 2nd male - replaced Vanity Panel @ 462mm x 462mm on 18mm MR MDF core faced front & rear in Alpi wood veneer laminate 10.97 both sides. Hardwood Oak lipped.
- Concealed all edges with a stain finish as close as possible to laminate colour. Each panel drilled for 3 hinges.
- Supplied and fit new hinges to each door.
RECENT JOBS
Replacement of Flat Roof
Replacement of flat commercial roof as part of a preventative maintenance programme
Replacement of Lighting in Car Park
Reactive maintenance to restore lighting in carpark in order ensure security and health and safety on compromised.
Thermoplastic road markings
Application of thermoplastic road markings
Roof Repairs
Reactive maintenance commercial roof repair involving the sealing of up stands and joints in roof felting due to a roof leak.
Resetting of granite setts
Resetting of granite setts and road resurfacing on roadway at office building complex as part of planned preventive maintenance.
Installation of steel bollards
Installation of steel bollards to separate pedestrians at retail centre.