Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage. They:
- Supplied and installed replacement doors to the:
– 5th,4th,3rd and 2nd female
– 4th , 3rd and 2nd male - replaced Vanity Panel @ 462mm x 462mm on 18mm MR MDF core faced front & rear in Alpi wood veneer laminate 10.97 both sides. Hardwood Oak lipped.
- Concealed all edges with a stain finish as close as possible to laminate colour. Each panel drilled for 3 hinges.
- Supplied and fit new hinges to each door.
RECENT JOBS
Outer Buildings Gutter Clean
Cleaning of gutters to prevent water ingress using spider boom and self propelled boom.
Preparation for New Tennants
Workman attended to ensure that all signage left by previous tenant was removed in preparation for new tenants’ arrival.
Locksmith / Window Locks
A locksmith attended to ensure that window locks operated effectively and hence were effective in securing the building.
Installation of Fire Doors
Installation of fire doors - SPA have a number of years experience of responding to Fire risk assessments and Health and Safety surveys.