Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage. They:
- Supplied and installed replacement doors to the:
– 5th,4th,3rd and 2nd female
– 4th , 3rd and 2nd male - replaced Vanity Panel @ 462mm x 462mm on 18mm MR MDF core faced front & rear in Alpi wood veneer laminate 10.97 both sides. Hardwood Oak lipped.
- Concealed all edges with a stain finish as close as possible to laminate colour. Each panel drilled for 3 hinges.
- Supplied and fit new hinges to each door.
RECENT JOBS
Water Ingress
Report commissioned to investigate water Ingress at commercial office.
Electrical Earthing Point
Uplift and relay of pavement in order to upgrade earthing rod to ensure compliant with regulations.
Lead Guttering Using Harnesses
Lifting and replacement of lead guttering following resin patch repairs using harnesses.
Gutter Repair
Repair of guttering preventing water ingress at residential flat.
Cleaning External
Cleaning and refreshing external parts of commercial building prior to being relet.
Boarding Up
Emergency call out to board up broken window on 3rd floor of office.